Click below to see photos:
11-2-09
New door being built for Castle Kataryna's new stone tower
7-31-09
Stone columns
stone arches set over colums
7-30-09
Window arches up
Stones set over top of window arches
7-25-09
Interior flared window columns under construction
Exterior window arches under construction
7-2-09
Tower under construction
Top exterior battlement and murder holes
5-30-09
Top exterior battlement corbels with connecting arches placed
5-27-09
Tower under construction
Top exterior battlement corbels and inner arches begun
2-10-09
Guide strings being used to build an arch
Arrow loop window of stone
Building an arrow loop window on the inside
Guide strings being used to build a straight column
Arch guide strings
First stones of an arch up
First corbel stones up
1-19-09
Pouring concrete, winter time
Castle wall poured, vertical steel and insulation visible