
Click below to see photos:
May 27, 08
Inside scaffolding removed from inside of new castle tower
Window and putlog holes visible
1st beam placed for interior floor
Plank floor laid over beams
August 11, 08 High resolution photos, may take a bit to download and appear, about 200kb each
Castle rising out of the forest
close-up
from side
Pumping concrete
Setting the first stone
8-25-08
Backfill, pallets of stone
Castle batter
Stone arch set, stone steps
8-29-08
Batters
Arch
9-20-08
Granite stone castle
Granite arches
Granite arch
10-5-08
Rebar up
Stone up
Arrow loops
Arch with keystone
Clock tower, Kataryna
10-21-08
Tower roof, Kataryna
10-31-08
Fireplace
Fireplace
Arrow loops
Arch
Arches
1-19-09
Pouring concrete, winter time
Castle wall poured, vertical steel and insulation visible
| HOME |
|---|