Installing castle window frames


This photo shows protected window frames in place as the stones stack up around them. The frames are ready for their stone arches to be placed. The beginnings of what will become beam support corbel stones can be seen between each window.

building an interior  castle arch


This photo shows an arch just after it was built. The arch will separate a dining room from a kitchen.


castle building photos

Putlog scaffolding going around towers to start the next level.


castle building photos

Insulation installed


castle building photos

Next level of stone placed on outside of insulation


castle building photos

Stone placed all the way around on the outside of the large tower


castle building photos

History tower with scaffolding removed


castle building photos

Stone wall on the edge of a cliff being built


castle building photos

Stone tower being built at the end of a cliff wall


castle building photos

New tower begun


castle building photos

Door frame in place prior to placing stones


castle building photos

Arch and keystone with arch assembly form still in place


castle building photos

Prior to stone placement the electrical conduits, reinforcing steel, and insulation are visible


castle building photos

Stone being placed around door frame


castle building photos

Backfilling new tower base


castle building photos

New tower addition


castle building photos

Arrow loop window


castle building photos

View of hallway arch top


castle building photos

First corbel stones installed


castle building photos

12-21-07 Quartzite corbel stones and stone offset


castle building photos

12-21-07 Tools of the mason