This photo shows protected window frames in place as the stones stack up around them. The frames are ready for their stone arches to be placed. The beginnings of what will become beam support corbel stones can be seen between each window.

This photo shows an arch just after it was built. The arch will separate a dining room from a kitchen.

Putlog scaffolding going around towers to start the next level.

Insulation installed

Next level of stone placed on outside of insulation

Stone placed all the way around on the outside of the large tower

History tower with scaffolding removed

Stone wall on the edge of a cliff being built

Stone tower being built at the end of a cliff wall

New tower begun

Door frame in place prior to placing stones

Arch and keystone with arch assembly form still in place

Prior to stone placement the electrical conduits, reinforcing steel, and insulation are visible

Stone being placed around door frame

Backfilling new tower base

New tower addition

Arrow loop window

View of hallway arch top

First corbel stones installed

12-21-07 Quartzite corbel stones and stone offset

12-21-07 Tools of the mason